Loading
Buffalo County
    
Highway   Map this place View on map

There are approximately 962 square miles in Buffalo County.  Within this area there are 1500 miles of road: 109 miles are County oil or concrete roads.  There are 343 bridges over 20 feet in the County.  There are also 238 bridges that are 20 feet and under which are not considered bridges but are classified as culverts because of the constricted water flow.
highway

The Highway Department has 42 full time employees and during the summer months we employ four to six more people. In addition to the Highway Superintendent there are: an assistant Highway Superintendent, two clerical, three foreman, 20 maintainer operators, five heavy equipment operators, three bridge crew laborers, one sign man, one welder, one mechanic, one mechanic assistant and four truck drivers.

We have an inventory of approximately $1,956,949 .00 which includes office equipment and supplies, signs, sign posts, lumber, steel, tools, culverts, filters, oil, grease, radios and other supplies.

We also have a large inventory of machines and equipment valued at $8,056,656.00. This includes 21 maintainers, one crane, two backhoes, seven crawlers, three loaders, five scrapers, five dozers, 35 pickups and trucks and a considerable number of other pieces of equipment. The cost of fuel alone for operating this equipment in the fiscal year 2017-2018 which ended June 30, 2018 was $441,708.00.  The cost of repairs was $328,193.00 which includes labor and mileage.

The Highway Department Budget for the present 2018-2019 fiscal year is $7,105,943.00.

We have an excellent communication system which includes 2-way radios which are used extensively. They save many miles of driving and enable people to communicate from one comer of the county to the other. They have saved many maintainer men from having to walk for help after having a flat tire, being stuck in a snowstorm or any other emergency type situation. Our foremen also have cellular phones. We have 2-way radios in all the maintainers, office, loaders and in a majority of our other equipment. The radios also give us communication with the Sheriff's Department and the County Surveyor. The telephone system gives us easier communication with the Sheriff's Department, Surveyor, other Courthouse offices and also the
City of Kearney offices by just dialing 4 digits.

country road
Buffalo County is divided into 26 Townships. The townships were dissolved in 2015. We have divided the townships into Zones 1 through 26. We bid gravel once a year. The bid period is from April 1 of one year to March 31 of the following year.

Buffalo County went to the GEO Base Addressing System and signs were installed in 1997.  This system makes finding a resident faster in an emergency type situation.



This article tagged as:

Places associated with this Article